|
|
|
Mr Wang Titang is nominated for Chairman and Party Secretary by the establishment of the first board of directors. |
 |
To embrace the coming millennium as well as 5th anniversary of the Group, 800 staffs took part in 5000 meter cross-country long run. |
 |
To prepare for the application of automatic office system next year, a company-wide computer training was held, in which members who never use computers felt pressure and fun at the same time for learning fresh things. |
 |
The Concrete Company became the first subsidiary company to obtain international authentication ISO9002.The certification enables the company to improve its level of quality management and establish a solid foundation for further development . |
 |
On April 28, the second-phase extension project of Xiamen Airport smoothly passed the completion inspection and was granted acceptance by the State.
|
 |
On Dec.6, the first Quality Control Activity Conference was held and 6 QC groups from subsidiary companies perform their presentation successfully. |
 |
At 0:00 local time on January 15, the 3400-meter runway which was included in Xiamen Airport''''s second-phase extension project was formally put into use with the approval of CAAC. Every specification and index had reached the designed standard of Code 4E airport to ensure that fully loaded Boeing 747-400 jumbo jet, the hugest aircraft in the world, could safely take off and land.
|
 |
On February 4, the Xiamen-Bangkok route was inaugurated.
|
 |
On March 28, Xiamen Airlines opened the Wuyishan-Macau charter flight service.
|
 |
On April 28, the second-phase extension project of Xiamen Airport smoothly passed the completion inspection and was granted acceptance by the State. |
 |
On June 27, Taiwan China Airlines invested USD 3.4 million in the Xiamen Airport with the approval of the Taiwan Authorities.
|
 |
|
|
|